Banjar Investasi PT works in partnership with Energy and Humanity Ltd on the Cempaka diamond project in South Kalimantan, Indonesia.
The cooperation brings together the project’s technical foundations, clear responsibilities and financing that fits each stage of development. A transparent structure connects the initial assessment with potential implementation.
Natural Diamonds. A Broader Development Perspective.
Cempaka lies in the south of Borneo. Historical project documents describe diamond-bearing gravels, an existing processing operation and land near Banjarbaru and Martapura.
Mining is the technical core. Land use after mining offers a second perspective, with its own requirements for rehabilitation, rights, infrastructure and permitted development.
Cempaka · South Kalimantan · Indonesia
A Historically Documented Deposit
Diamonds occur in the gravels of ancient river channels. The technical statement distinguishes Danau Seran, Cempaka and Baruh Bada, where gravel thickness, grade and overburden vary.
The resource and reserve statements date from 31 December 2019. Geological confidence and economic recoverability are different measures; current investigations, sampling and a reviewed mine plan are needed for a new project decision.
GIA’s 1988 study provides geological context for this alluvial deposit type. Dewatering and slope stability remain central to the technical sequence.
NATURAL DIAMONDS
The Character of Each Parcel
Green, blue and yellow rough diamonds feature in the supplied project imagery. Their value depends on the size, colour and quality of the parcels actually recovered.
Independent valuation and documented sorting establish a project-specific basis for marketing. Traceable origin, secure handovers and the applicable Kimberley Process export requirements accompany the flow of goods. Colour alone cannot establish a price for future production.
OPERATING INFRASTRUCTURE
A Technical Base to Build On
The historical documentation shows a dense-media separation plant, screening equipment, X-ray sorting and final recovery stages. Excavators, dump trucks and wheel loaders are supported by workshops, power supply and a camp.
A current inventory will establish what is available, what can be restored and which components need replacement.
Processing
Sorting
Recovery
Reactivation Starts with the Groundwork
Water testing, pumping, settling ponds and pH control form part of the proposed preparation. Discharge conditions and slope stability must be checked against the present condition of the site.
Equipment repairs lead into a controlled trial operation. Recovery, diamond quality, operating costs and environmental performance provide the evidence for any later expansion.
Water Management
Equipment
Trial Operation
LAND DEVELOPMENT
A Perspective Beyond Mining
Earlier plans envisage residential and agricultural use after mining. The location near Banjarbaru and Martapura provides a basis for investigating that longer-term potential.
A development concept begins with verified titles and parcel boundaries. Rehabilitation, water management, access and utilities must support the intended use.
Mining and land development remain separate undertakings, each with its own feasibility assessment, permits, financing and marketing.
Clear Rights. Accountable Decisions.
Rights & Permits
PT Galuh Cempaka is identified as the Indonesian operating company. The ownership chain, land rights and permits need to be reconciled with current registers and contracts.
Historical project materials and ANTAM’s 2025 reporting contain different ownership figures. This point requires clarification before a binding investment.
A Structure Matched to the Project Stage
Reactivation, trial operation and expansion create different funding needs. The term sheet should define investment rights, budget responsibility, drawdown conditions and control over the use of funds.
Acceptance & Reporting
Technical acceptance tests support decisions at each stage. Production, water quality, costs and progress should be reported transparently. Any investment model must use current valuations, a reviewed mine plan and confirmed costs.
A Coordinated Mandate for the Next Development Stage
The Cempaka cooperation connects the technical project with the corporate, financial and institutional work needed to assess its next stage. The development pathway should be based on current evidence and clearly assigned responsibilities.
Bringing the Project Evidence Together
A structured data room should connect the historical project documents with current corporate records, rights, permits and a verified site inventory. This gives the relevant specialists and prospective financing partners a common starting point for their assessment.
Linking Technical Results to Investment Decisions
Site investigations, equipment assessments and trial operation can clarify the work required for reactivation. Updated costs, operating assumptions and rehabilitation requirements should inform each financing decision and any proposed expansion.
Coordinating Partners and Responsibilities
Energy & Humanity contributes its project development perspective and international financial relationships to the coordination of the proposed pathway. The operating company, specialist advisers and financing counterparts retain their respective responsibilities under the agreed project structure.
Our Involvement in the Cempaka Mine Project
Energy & Humanity is involved in the Cempaka mine project through its cooperation with Banjar Investasi PT. Our contribution brings together project development, international financial relationships and the coordination of the proposed development pathway. We work with the relevant project partners to connect the technical, commercial and financing work required for the next stage.
Explore the Cempaka Development Path
The October 2026 project profile proposes a staged review. Each next step depends on the required evidence, technical results and approvals. This sequence is a planning framework.
01020304
Baseline Review & Data Room
Q4 2026: Bring together corporate records, land titles, permits and outstanding obligations. Complete a current inventory of the site and equipment.
Technical & Legal Review
Q1 2027: Review the deposit, mine plan, dewatering and rehabilitation. Confirm rights and prepare current cost estimates.
Financing & Project Approval
Q2 2027: Define the capital requirement, investment rights, drawdown conditions and technical acceptance plan.
Reactivation & Trial Operation
After approval: Implement the approved works. Trial operation and acceptance testing establish the basis for a possible production start.
Project documentation & source notes
Investor Pack & Technical Statement
Investor Pack: 20 October 2019, Rev. 2. Resource and reserve statement: 31 December 2019, pages 1 and 4. Historical reporting requires specialist reassessment; resources and reserves have distinct meanings.
Equipment & Land Documentation
Preliminary Works and historical project imagery. The filename refers to 2015, while its title states April 2019 to September 2020. The land illustration is conceptual.
Geology & Trading Context
GIA / Gems & Gemology, The Diamond Deposits of Kalimantan, Borneo, summer 1988. De Beers first-half 2026 results and Kimberley Process requirements provide supplementary context.
Corporate Records & Project Profile
ANTAM financial documents from 2025; Energy and Humanity website and imprint. Compiled in the supplied Cempaka Diamonds profile, October 2026. Ownership figures require reconciliation.
The images on this page are AI-generated illustrations and development concepts. They do not document the present condition of the Cempaka site or its equipment.
YOUR PROJECT
Let’s Discuss the Cempaka Project
Contact Energy and Humanity Ltd to discuss your opportunity, project requirements and the next stage of development.